• weker01@feddit.de
    link
    fedilink
    arrow-up
    21
    ·
    4 months ago

    This is waterfall method propaganda! It never works out this smoothly. They probably forgot important requirements like: the astronauts need to be alive on Mars.

    • Blackmist@feddit.uk
      link
      fedilink
      English
      arrow-up
      9
      ·
      4 months ago

      Or the funders get bored of waiting after ten years of “no Mars yet” and cancel the project, leaving you with a half finished rocket.

    • criss_cross@lemmy.world
      link
      fedilink
      arrow-up
      7
      ·
      4 months ago

      Waterfall is missing the part where the customer realizes they didn’t actually want to go to Mars they just wanted to view it out of a telescope.

      But now they can only travel to Mars and the telescope is out of the budget because you spent so much money on the rocket

    • Bezier@suppo.fi
      link
      fedilink
      arrow-up
      4
      ·
      edit-2
      4 months ago

      2 years later: It’s now up to the lawyers to figure out if it’s the rocket that doesn’t meet agreed requirements or if it’s on the customer for not giving proper requirements.

    • psud@aussie.zone
      link
      fedilink
      arrow-up
      2
      ·
      edit-2
      4 months ago

      Actual real world right now giant rockets include

      • One that is being built under waterfall methodology. It has been being built for several years. That’s the Blue Origin New Glen heavy lift reusable rocket

      • One that is being developed under an agile methodology, it flew as a subscale lander to test their engine and flight control, it has flown four full test flights, improving on each. That’s SpaceX’s Starship

      We are yet to see either launch a payload to orbit

  • magic_lobster_party@kbin.run
    link
    fedilink
    arrow-up
    11
    ·
    4 months ago

    I think this is a bit disingenuous. There’s no customer interaction in these panels.

    So waterfall would be:

    Customer says they want to go to Mars.

    You spend years building a rocket capable of going to Mars, draining all the company budget in the process.

    Customer then clarifies they actually meant they wanted to go to Mars, Pennsylvania, USA - not the planet!

    • Carighan Maconar@lemmy.world
      link
      fedilink
      arrow-up
      2
      ·
      4 months ago

      Also the strip stops midway through as Waterfall was an invented thing just for a paper. And during your UP work you actually had the customer put in that input and hence it was like in this cartoon strip.

  • rimjob_rainer@discuss.tchncs.de
    link
    fedilink
    arrow-up
    8
    ·
    edit-2
    4 months ago

    The creator does not know Scrum, it’s about transparency and not intransparency.

    Also Kanban, Scrum and Lean Development are all agile development.

  • Optional@lemmy.world
    link
    fedilink
    arrow-up
    6
    ·
    4 months ago

    Waterfall method: talk about building a rocket for 5 years, build the rocket, rocket needs to be totally redesigned because we forgot to put a place for people to go - massive change reqeust, build new version. Project Delay: 27 years

    Agile Method: a rocket is not software - do not use Agile

    Kanban - kanban is agile

    Scrum - scrum . . is also Agile. What are you doing, go back and do the waterfall one

    • snek_boi@lemmy.ml
      link
      fedilink
      English
      arrow-up
      5
      ·
      edit-2
      4 months ago

      Your comparison is interesting, but let’s consider some historical facts. The Apollo program, which successfully put humans on the moon, actually employed many principles we now associate with Agile methodologies.

      Contrary to popular belief, it wasn’t a straightforward Waterfall process. NASA used frequent feedback (akin to daily Scrums), self-organizing teams, stable interfaces so that teams are an independent path to production, and iterative development cycles - core Agile practices. In fact, Mariana Mazzucato’s book Mission Economy provides fascinating insights into how the moon landing project incorporated elements remarkably similar to modern Agile approaches. Furthermore, here’s a NASA article detailing how Agile practices are used to send a rover to the moon: https://ntrs.nasa.gov/api/citations/20160006387/downloads/20160006387.pdf?attachment=true

      While it’s true that building rockets isn’t identical to software development, the underlying principles of flexibility, collaboration, and rapid iteration proved crucial to the missions’ success. Programs like the Apollo program adapted constantly to new challenges, much like Agile teams do today.

      Regarding Kanban and Scrum, you’re right that they fall under the Agile umbrella. However, each offers unique tools that can be valuable in different contexts, even outside of software.

      Perhaps instead of dismissing Agile outright for hardware projects, we could explore how its principles might be adapted to improve complex engineering endeavors. After all, if it helped us reach the moon and, decades later, send rovers to it, it might have more applications than we initially assume.

      • Lichtblitz@discuss.tchncs.de
        link
        fedilink
        arrow-up
        3
        ·
        4 months ago

        Also, Kanban was invented in the 40s as a process for automotive production lines. That’s why it aligns so well with maintenance and operations projects in IT. It’s ridiculous how more and more people claim it comes from software development and would not fit hardware projects, when that’s the core use case of the methodology.

        • Optional@lemmy.world
          link
          fedilink
          arrow-up
          1
          ·
          4 months ago

          Good points all - I was just responding to a comic strip that I think meant to riff on the old, “what the customer wanted”, “how sales described it”, “what engineering proposed” etc. about project management but it just wasn’t finding the funny as it put the onus on Agile like isn’t this a silly discipline - well, no. :)

          Ah, here it is:

      • Optional@lemmy.world
        link
        fedilink
        arrow-up
        1
        arrow-down
        1
        ·
        4 months ago

        Agile methodology is a defined framework for software development success. It helps teams adapt and solve specific needs at a given time and prioritizes accelerated time to market and the value of user insights. Agile is based upon a set of four values and twelve principles laid out in the Manifesto for Agile Software development.

        Via https://builtin.com/agile

        • CanadaPlus@lemmy.sdf.org
          link
          fedilink
          arrow-up
          2
          ·
          edit-2
          4 months ago

          See, the thing with that is it’s just really aspirational. Anything could be Agile if you do it in the right spirit, if the manifesto is the whole thing.

          Edit: I suppose what I should have asked is: “Is Agile really a system, or just a philosophy?”

          • Optional@lemmy.world
            link
            fedilink
            arrow-up
            2
            ·
            edit-2
            4 months ago

            It’s both. The word “Agile” is used for either depending on context.

            To that end, it’s several “systems” depending on if it’s used for straight-software development in a department, or manufacturing with technological components, or an entire enterprise using Agile concepts (like SAFe). Each one could be slightly different, and each one is some variation on the philosophy.

            What it differs from mostly is a phase-gate approach typified by project management, where a plan is made, a budget secured, and a timeline set. All of those things are of course present in Agile, just in different ways and not one-after-the-other.

            The big difference is project management has been around forever; Agile just over twenty years. So the former is what everybody knows by default, the latter sounds very “woo woo” to a lot of people. I think that’s really what the comic is trying to say - Agile stuff sounds silly.

    • CanadaPlus@lemmy.sdf.org
      link
      fedilink
      arrow-up
      1
      arrow-down
      2
      ·
      edit-2
      4 months ago

      NASA also built the space shuttle, which was a plane that couldn’t fly by itself (as it was supposed to), was slower to turn around and more expensive than older equivalent technologies, and blew up all the astronauts 1.5% of the time.

      I mean, they’re great at other things - who else could have made the JWST work flawlessly with one opportunity - but they’re a definite source of hype, and they do something very particular and specialised. Beware endorsements.

      Edit: Fuck you, I’m right. Keep 'em coming.

      I don’t even care about Agile either way. This just isn’t a good argument for it.

      • snek_boi@lemmy.ml
        link
        fedilink
        English
        arrow-up
        1
        ·
        edit-2
        4 months ago

        I can see you’re frustrated by the downvotes and pushback you’ve received. It’s understandable to feel defensive when your viewpoint isn’t well-received. I appreciate you sharing your perspective, even if it goes against the majority opinion here.

        Your points about the space shuttle program’s challenges are valid and worth discussing. It’s important to note the timeframes involved though. The shuttle was developed in the 1970s, well before agile methodologies emerged in the 1990s and 2000s.

        Interestingly, one could argue that NASA may have used agile-like practices in the space shuttle program, even if they weren’t labeled as such at the time. However, I did a quick search and couldn’t find much concrete evidence to support this idea. It’s an intriguing area that might merit further research.

        Regarding modern agile approaches, while no method is perfect, many organizations have found them helpful for improving flexibility and delivering value incrementally. NASA’s recent use of agile for certain projects shows they’re open to evolving their methods.

        I’m curious to hear more about your thoughts on software development approaches for complex engineering projects. What do you see as the pros and cons of different methodologies? Your insights could add a lot to this discussion.

        • CanadaPlus@lemmy.sdf.org
          link
          fedilink
          arrow-up
          1
          ·
          4 months ago

          I can see you’re frustrated by the downvotes and pushback you’ve received. It’s understandable to feel defensive when your viewpoint isn’t well-received. I appreciate you sharing your perspective, even if it goes against the majority opinion here.

          Thanks for the kind words. FWIW I’m doing fine, this feels like a worthy fight. I know a bad appeal to authority when I see one.

          Interestingly, one could argue that NASA may have used agile-like practices in the space shuttle program, even if they weren’t labeled as such at the time. However, I did a quick search and couldn’t find much concrete evidence to support this idea. It’s an intriguing area that might merit further research.

          There’s somebody else in the thread talking about the Apollo missions and Agile. Uhh, here, because I don’t know if federated comment links are supported yet. There’s no source for that already provided, though.

          What do you see as the pros and cons of different methodologies? Your insights could add a lot to this discussion.

          Honestly no. Sorry to undercut you a bit, but I’m not going to be the Dunning-Kruger guy. I know that I don’t know project management.

        • CanadaPlus@lemmy.sdf.org
          link
          fedilink
          arrow-up
          1
          ·
          edit-2
          4 months ago

          Yep. They’re probably better than anyone at making a complex system with literal moving parts that works 100% of the time, the first time. On a nearly unlimited budget, with a decades-long schedule. In an institution and culture that’s now a been around a lifetime, staffed with top-notch people.

          That’s all perfect for what NASA does, but I wouldn’t recommend a management system that NASA uses to just anyone, just 'cause “da astronauts” use it. Not any more than I’d recommend drinking your own distilled piss to anyone.

          I don’t really have an opinion on Agile, even, I just have a problem with selling it this way.

  • Codex@lemmy.world
    link
    fedilink
    arrow-up
    2
    ·
    edit-2
    4 months ago

    Someone shared this on Mastodon so I’ll just repost my thoughts from there. (Bonus for Lemmy, I was forced to squeeze all my thoughts into 500 characters, so this is the most succinct I’ve been on this site!)


    Pretty incredible how little people seem to understand these. For one thing, every method other than waterfall is a subtype of agile methodology. The major distinction is that waterfall has a series of phases from design through building, testing, and delivery that attempts to plan the whole project up front. Agile methods focus on smaller iteration cycles with frequent, partial deliverables.

    Something like kanban is designed for continuous delivery: we want to go to mars weekly.

    LEAN development is a scam though, that one is accurate.

    • magic_lobster_party@kbin.run
      link
      fedilink
      arrow-up
      1
      ·
      4 months ago

      The author is also hyping up waterfall too much. Agile was created because waterfall has its shortcomings (e.g. the team realizes too late that what they’re building isn’t what the customer wants).

      But I also think it also represents how poorly implemented these ideas are. People say they do agile/kanban/scrum, but in reality they do some freak version of these.

        • magic_lobster_party@kbin.run
          link
          fedilink
          arrow-up
          1
          ·
          4 months ago

          It’s barely waterfall planning either. Often there’s no planning, at least no coordinated one.

          Currently at my current workplace we lack coordinated planning between teams. It seems like everybody is working in their own directions and it can take months until we get feedback from other teams. Mostly a product management problem.

  • pfm@scribe.disroot.org
    link
    fedilink
    arrow-up
    2
    ·
    4 months ago

    If the person who drew that comic understood anything about complex systems or why agile works when used properly, it could make sense. But it doesn’t.

  • 31337@sh.itjust.works
    link
    fedilink
    arrow-up
    2
    ·
    4 months ago

    I don’t understand the Scrum one. Scrum is also agile with short development cycles, and prioritizes communication with the product owners and stakeholders.

    I’ve never heard of lean development, but not a fan of “lean manufacturing,” at least not the way it’s commonly implemented in the U.S. (using primarily temp workers so they can ramp up and down their workforce as needed; and it also exacerbates supply-chain problems).

  • golden_calf@lemmy.world
    link
    fedilink
    arrow-up
    1
    ·
    4 months ago

    The art style is nice but the content makes no sense. Kanban and scrum are parts of agile. They are not their own systems.

    Lean also doesn’t mean you have no money. It’s a system of manufacturing where you cross train people to do the jobs on either side of them so they can pick up slack if needed and keep things moving without hiring more people.

  • anton@lemmy.blahaj.zone
    link
    fedilink
    arrow-up
    1
    arrow-down
    1
    ·
    4 months ago

    What is the methodology called where you:

    Plan to go to orbit, blow up seconds into the flight, and declare it a success.

    Plan to refuel in orbit, make it minutes before the rocket brakes. Fire the FTS, it fails, the rocket blows up a minute later und declare it a successful test of the FTS.

    Argue to NASA that you are not the limiting factor to the moon mission planed for the end of the year, despite delivering none of the milestones.

    FTS = flight termination system

    • ghterve@lemmy.world
      link
      fedilink
      arrow-up
      1
      ·
      edit-2
      4 months ago

      I call that following the same successful recipe that got us the Falcon 9.

      The mindset that considers those tests failures is the same one that would still be in bureaucracy hell determining what 40 year old technology we should repurpose to get a future over budget, late, and under performing solution designed and built.

    • Zarlin@lemmy.world
      link
      fedilink
      arrow-up
      1
      ·
      edit-2
      4 months ago

      That’s called R&D, Research and Development. As long as you learn from a failure, it is progress towards success.

    • psud@aussie.zone
      link
      fedilink
      arrow-up
      1
      arrow-down
      1
      ·
      edit-2
      4 months ago

      I take it you missed the recent fourth integrated flight test, in which the ship soft landed on the ocean near Australia as planned and the booster soft landed on the ocean near the launch site as planned

      Their failure in that flight was expected. They hoped thermal tiles sealing the hinge for the aerodynamic surfaces would seal those against plasma during reentry. They didn’t. Had they, it would have been much cheaper than sealing those more thoroughly. The ship landed regardless of that failure

      Disliking Musk is fair, but SpaceX is doing good stuff